Skip to content
Paradigm

Packet Readyfor solar installers

Less paperwork between signed contract and installed system.

Prepare interconnection and permit packets faster, with a person checking each one.

In your words

  • “Every utility wants a different form.”

  • “Permit packets eat my admin's week.”

  • “A small error sends the application back for weeks.”

What we build

A system that gathers project data (design files, site details, equipment specs), fills the right utility and permit forms, and flags missing or inconsistent items before submission. Your coordinator reviews each packet.

How a project could move through the system:

  1. Signed project
  2. Design and equipment data gathered
  3. Utility and permit forms filled
  4. Completeness check flags missing items
  5. Coordinator reviews and submits
Illustrative concept, sample data
Illustrative concept, sample data

How it works

  1. 1

    Week 1: review 10 recent packets and the utilities you work with.

  2. 2

    Weeks 2-5: build packet preparation for your top 1-2 utilities.

  3. 3

    Weeks 5-8: run on real projects with review, then extend.

Typical timeline: 6 to 8 weeks (target; depends on number of utilities).

What we need from you

  • Sample packets
  • Templates per utility
  • Access to your design/CRM tool

Questions

Do you submit to the utility?

Not at first; we prepare, your team submits.

Which states?

Start with your top utilities; we confirm coverage on the call.

Talk to our team and bring one recent packet.

Become a design partner

We are taking on a small number of design partners per industry. You get a pilot on your own documents at a reduced fixed price, and we shape the product around your workflow.